No joints above or within 2 feet of top of pole.
Mobile home meter pole installation.
25 foot pole no disconnect or meter base overhead service bare pole only 360 00.
With that said try finding a moving company that can will handle all aspects of installation.
Alternate location for pedestal.
Position pedestal so that electric meter is facing away from mobile home.
The mhm200p is 200 amp unit and is designed with ample width to ensure plenty of room for wire bending and an easier installation.
Pole with 480v 30 amp disconnect.
See below for our assembly guide for meter pole installation.
Metering installations for mobile homes or mobile home parks.
Install on side of pole opposite service drop.
Three metal conduit straps minimum one near top one mid way and one within a foot of the meter socket.
Two ft of conduit above pole.
The pole must be treated and be at least a class 7 round or 6 x 6 square and have a minimum of 14 5 feet above the ground.
Eaton s versatile mobile home panels have a user friendly design that allows for a faster cleaner installation.
Fasten each strap with two galvanized 1 4 by 2 1 2 lag screws.
5 1 2 from ground to center of meter mobile home poles and must be within 24 of eyebolt minimum of 12 heighth to weatherhead 200 amp.
Overhead installations the metering pole must be a minimum of 17 ft class 5 pole set at least 4 ft deep so that it will be of sufficient height and stability to provide service drop clearances as shown on page 31.
When one of these mobile homes need a wiring overhaul it is best to upgrade to 200 amp service.
Use 2 0 thw hotlegs with minimum 18 tails for connection tvec will spot all mobile home poles 1 neutral stranded copper meter base unbroken for connection galvanized steeples or wire holding.
Overhead service to.
Pvc conduit to the home gray schedule 40 or.
Meter base mounted on exterior wall of house or mobile manufactured home.
Older mobile homes were manufactured to provide 100 amp electrical service.
If metallic weather head is used with pvc conduit it must have a bonding ground.
Trench depth shall be 30 inches minimum with or without gas service and greater if joint with a gas main.
Street 36 min.
Pole with meter base and 240v 200 amp disconnect.
To do the rest of the work.
Overhead service to mobile home.
25 foot meter poles and fused disconnect poles.
Some moving companies will only go so far to transport your mobile home and leave it to you to find a plumber electrician etc.
All meter sockets shall be mounted in a manner that allows meters to be inserted and withdrawn.
Hooking the home up to sewer lines and electric meters is not a simple diy project.